Address
97-z Zhylianska St, Kyiv, 01135, Ukraine
Grid connection technical specifications (TU) were obtained from NPC Ukrenergo, and the grid connection agreement was signed. The agreement provides for a phased project roll-out and limits the total installed capacity of the wind turbines to 151.2 MW.