Address
97-z Zhylianska St, Kyiv, 01135, Ukraine
As part of the Environmental Impact Assessment (EIA) procedure required for wind farms, year-long monitoring cycles for birds and bats were conducted. The final report conclusions confirm that the wind turbine equipment can be installed at the designated project locations, with an environmental impact well within legally permissible limits.